Who this checklist is for
-
Step 1: Meter the real loads for a full week before you call anyone
-
Step 2: Decide single-phase or three-phase before you compare prices
-
Step 3: Read the hybrid inverter spec sheet like a skeptic
-
Step 4: Vet the manufacturer, not just the listing
-
Step 5: Size the battery for your worst week, not your best day
-
Step 6: If you store water on site, add a wireless tank monitoring system
-
Step 7: Know what the charge controller does—before you pay for one
-
Common mistakes I've made (so you don't have to)
Who this checklist is for
I'm the office administrator for a 120-person company. Officially, I buy everything from office supplies to facility services—roughly $400,000 a year across nine vendors. Unofficially, I'm the person who gets the call when the generator at our remote equipment shed dies at 2 a.m. and nobody knows why the water alarm didn't fire.
That's how I ended up sourcing off-grid solar for three of our outlying sites: two equipment sheds and a small staff residence. This checklist is the version I use now, after two years of getting it wrong first. It's written for the buyer who signs the PO and has to explain the decision to finance and operations—not for the electrician who actually installs it.
Seven steps, in the order I actually do them.
Step 1: Meter the real loads for a full week before you call anyone
This is the step most buyers skip, and it's the one that sets your whole budget. Before I talk to a single vendor, I put a data logger on the panel at each site for seven days. What I'm after is the peak draw and the evening baseline—not the nameplate numbers on the equipment.
Nameplate wattage is fiction. A 1.5HP pump that runs twice a day doesn't pull the same load as a 1.5HP pump running continuously, and only one of those numbers matters when you're sizing an inverter and a battery bank. When I skipped this in 2023, I sized a system 40% larger than we needed and cost the company about $3,800 in unnecessary hardware. I've metered every site since.
Checkpoint: You should end this step with a one-page sheet listing continuous load, peak load, daily kWh, and the longest expected stretch without sun.
Step 2: Decide single-phase or three-phase before you compare prices
This one bit me. Our residence site is single-phase, so a deye 12kw hybrid inverter single phase was a straightforward fit for the load profile—the contractor proposed it, I checked the spec sheet against the meter readings, and it matched with headroom. But one of our sheds runs a three-phase irrigation pump, and no amount of price-shopping a single-phase unit was going to make that work.
For that site we went with a 3 phase solar inverter off grid setup instead. Different price bracket, different lead time, and—this is the part I didn't appreciate at first—a different set of installation requirements. The lesson: phase configuration is a property of your equipment, not a purchasing preference. I now ask the maintenance lead to confirm motor phase before I request a single quote.
Part of me wanted to standardize on one inverter model across all three sites for simplicity. Another part knew that forcing a single-phase unit onto a three-phase pump would have been a $12,000 mistake. I compromised: same manufacturer where possible, correct phase everywhere.
Step 3: Read the hybrid inverter spec sheet like a skeptic
"Hybrid" gets used loosely. What I actually check on a spec sheet, in this order:
- Continuous output vs. surge rating. The surge number matters more than the steady-state number for pump starts.
- Grid-tie vs. off-grid modes. Some units do both, some only one. If you might add grid later, buy the one that does both now.
- Battery chemistry compatibility. Lead-acid and lithium are not interchangeable, and the supported list changes between firmware versions.
- Grounding requirements. This is the one nobody reads until an inspector does. Deye's installation documentation is unusually explicit about earthing conductor sizing—use that as a reference even if you don't buy their unit, because it's a good sanity check on the contractor's plan.
Here's something vendors won't tell you: the "in stock" SKU is often a slightly different revision than the one in the brochure. I now ask for the current datasheet PDF by email and compare the model number digit by digit before the PO goes out.
Step 4: Vet the manufacturer, not just the listing
I learned this the hard way with a 5kw deye inverter manufacturer search that returned about fifteen "authorized" resellers, four of which couldn't produce a spec sheet in under 48 hours. That's a red flag.
What I check now: Does the manufacturer publish a downloadable installation manual? Is there a support contact that isn't a generic web form? Can the reseller tell me the firmware version shipping with current stock? If the answer to any of those is "let me get back to you," I move on. It's not about brand loyalty—it's that a hybrid inverter with no documentation is a deal-breaker when it fails at a remote site on a Sunday.
Step 5: Size the battery for your worst week, not your best day
Most sizing guides use average daily consumption. That's fine for a grid-tied system. For off-grid, average is the wrong number—you need the three-day stretch in January when it's overcast and the pump still has to run.
The conventional wisdom is to add 20% headroom and call it done. My experience with two winters at the residence site says 20% is the floor, not the ceiling. We went with roughly 35% headroom after the first winter, and the battery has never dropped below 40% state of charge since. That's the ballpark I'd suggest for anyone in a similar climate.
Step 6: If you store water on site, add a wireless tank monitoring system
This wasn't on my original list, and it should have been. The residence site has a 2,000-gallon storage tank feeding a pump house, and for the first year someone had to drive out and physically check the level. That's a 90-minute round trip, twice a week.
A wireless tank monitoring system cut that to a dashboard glance. The one I'd recommend as a starting point: it should report level, temperature, and a low-level alert to email or SMS, and it should run on battery or solar so it doesn't become another load on your system. Ours cost in the $300–$600 range for a single-tank sensor kit plus gateway (based on publicly listed prices in early 2025; verify current pricing and check whether subscription fees apply—some do, and that's a hidden line item).
So glad I pushed for the alert feature. We almost went with a level-only unit to save $70, which would have meant no notification when the float valve failed in August.
Step 7: Know what the charge controller does—before you pay for one
If you're the buyer and not the installer, the basics are enough: a charge controller regulates the voltage coming off the panels and delivers it to the battery in a form the battery can actually accept. Without one, panel output swings and battery life drops fast.
The practical decision for a buyer is MPPT vs. PWM. MPPT controllers squeeze more usable power out of the same panels—typically in the 10–30% range depending on conditions—and they cost more. For our sites, MPPT was a no-brainer because the panels are mounted at an angle and don't always see ideal sun. For a small shed with two panels at ideal angle, PWM might be fine. Ask the contractor which one they specified and why. A blank stare is your answer.
One clarification since I got this wrong initially: in many hybrid inverters, the charge controller is built in. The spec sheet will list a "built-in MPPT" rating. Don't buy a separate controller just because a quote line item says "charge controller"—confirm whether it's internal or an add-on.
Common mistakes I've made (so you don't have to)
Trusting the first quote. Our first for the residence site came in at $18,400. The second was $13,900 for the same spec, and the difference was one line item—battery racking—that had been marked up 60%. Always get two.
Forgetting the mounting and grounding scope. Inverter price is maybe 30% of the project. Grounding, conduit, trenching, and labor are the rest, and they vary wildly by site. This is also where code compliance lives—NEC Article 250 sets the grounding rules, and Deye's manuals are a helpful cross-check. Don't let a contractor tell you "we always do it this way" without a code citation.
Assuming the inverter is the whole system. It isn't. Panels, battery, controller, monitoring, and the wiring between them are all line items, and about half of them are easy to miss if you only compare inverter prices.
Bottom line: for a hybrid or off-grid site, size from real meter data, match the phase to your equipment, vet the manufacturer's documentation before the reseller's price, and budget for the parts that aren't the inverter. The rest is follow-through.
Prices cited are for general reference based on quotes and publicly listed figures in early 2025; actual costs vary by site, vendor, and specifications. Verify current rates and local code requirements before ordering.